📞 +92 321 9221123 ✉ info@aimstec.com.pk
Plot B-56, Korangi Industrial Area, Karachi

Engineering & Environmental
Consultancy Pakistan

Statutory environmental studies (EIA, IEE, HWMP), greenhouse gas inventory, carbon footprint assessment, GHG inventory (ISO 14064), and diverse engineering consultancy — PEC registered.

EIA
Impact Assessment
IEE
Initial Examination
HWMP
Waste Management
PEC
Registered
Consultancy Services

EIA, IEE, HWMP & Carbon Footprint — Filed Correctly.

AIMS TEC consulting provides engineering services and expertise to companies requiring specialized skill sets — from statutory environmental studies to greenhouse gas inventories, carbon footprint assessments, and diverse process engineering reviews.

🌱

Environmental Consultancy

Comprehensive environmental consulting for regulatory compliance and sustainability.

  • Environmental Impact Assessment (EIA)
  • Initial Environmental Examination (IEE)
  • Hazardous Waste Management Plan (HWMP)
  • Environmental Management Plans (EMP)
  • ETP Design & Optimization
  • NEQS Compliance Audits
  • Greenhouse Gas (GHG) Inventory
  • Carbon Footprint Assessment & Reporting
🏗

Diverse Engineering Consultancy

Broad-based engineering consultancy across mechanical, electrical, process, and civil disciplines.

  • Process Engineering & Optimization
  • Plant Layout & Design Review
  • Feasibility Studies
  • Technical Due Diligence
  • Asset Integrity Management
  • Operational Efficiency Optimization
  • Energy Audit & Efficiency Studies
  • Industrial Hygiene Studies & Reports
Process

How We Work With You

1

Discovery

Understanding your challenges, regulatory obligations, and project objectives.

2

Analysis

In-depth technical analysis, baseline data collection, and impact assessment.

3

Recommendation

Practical, actionable recommendations including carbon reduction strategies.

4

Implementation

Supporting implementation, regulatory submission, and follow-up.

FAQ

Common Questions

What is an Environmental Impact Assessment (EIA) and when is it required in Pakistan?+

An EIA evaluates the environmental effects of a proposed industrial or infrastructure project before it proceeds. EPA Sindh requires EIAs for projects above a specified threshold — including factories, power plants, housing schemes, and industrial estates. AIMS TEC prepares full EIA reports covering baseline surveys, impact prediction, mitigation measures, and public consultation documentation for EPA Sindh submission.

What is the difference between an EIA and an IEE?+

An Initial Environmental Examination (IEE) is a simplified environmental assessment required for smaller or lower-risk projects. An EIA is a full detailed study required for larger or higher-impact projects. EPA Sindh categorises projects by type and scale to determine which is required. AIMS TEC advises clients on which applies to their project and prepares both types for EPA Sindh submission.

What is a Hazardous Waste Management Plan (HWMP) and who needs one?+

An HWMP documents how a facility identifies, classifies, handles, stores, treats, and disposes of hazardous waste in compliance with Pakistan environmental regulations. Any facility generating hazardous waste — including textile, pharmaceutical, chemical, and manufacturing operations — is required to have an HWMP. AIMS TEC prepares HWMPs as standalone documents or as part of EIA/IEE studies.

What does ISO 9001, ISO 14001, or ISO 45001 implementation involve?+

ISO implementation involves gap analysis, documentation of processes and procedures, staff training, internal audits, and preparation for third-party certification. ISO 9001 covers quality management, ISO 14001 covers environmental management, and ISO 45001 covers occupational health and safety. AIMS TEC provides full IMS implementation consultancy — from initial gap assessment through to certification readiness — for all three standards individually or as an integrated management system.

How long does an EIA or IEE take to complete?+

An IEE typically takes 3–6 weeks depending on the project complexity and baseline data availability. A full EIA can take 2–4 months including baseline surveys, impact assessment, and report preparation. EPA Sindh review timelines vary. AIMS TEC advises on realistic timelines at the outset and provides a written scope and schedule before work begins.

Do you provide GHG inventory and carbon footprint assessment?+

Yes. AIMS TEC prepares Scope 1, 2, and 3 GHG inventories aligned with ISO 14064 and the GHG Protocol. We also prepare organisational and product-level carbon footprint assessments and ESG reporting data for international buyers and sustainability disclosures. This is increasingly required by international buyers sourcing from Pakistan's textile, food, and manufacturing sectors.

Take Action Before the Audit

Ready to Get Compliant Without Delays?

Fixed-cost quote within 4 working hours. Scope confirmed before work begins. No surprises on the invoice.

ISO accredited · EPA Sindh certified · 490+ industrial clients · All Pakistan

Chat with us now